Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13599970

- Product Categories
- Friendly Links
Insulation decorative plate precautions when wet paste
2015-05-23 Reads : 40
Insulation decorative board traditional painting mode field complex operations and simplify simple installation of the scene. So what insulation decorative plate precautions when wet paste is? Following small detailed answer: (1) Brushing mortar interface: the interface with the brush or broom mortar evenly brushing or mechanical spraying. Not leak brush, nap not too thick. (2) primary wall treatment: for dirt on the wall, soft hollowing plaster layer and grease, etc., should eradicate clean, to repair damaged plaster layer must be leveled. Long moss old wall, use pesticides thorough cleaning. New building exterior plastering should be consistent with regulatory requirements. (3) polymer bonded sand preparation: adhesive mortar: water = 4.5: 1 (weight ratio) and water (reference scale) assigned by using an electric blender full uniform, standing for 5-10 minutes, stir again use, mixing good mortar within 2 hours, forbidden to secondary mixing mortar solidified and then put into use. (4) The review of the size of the drawings, wall actinomycetes: In the side wall, the top of the plate thickness according to insulation decorative hanging vertical, set square, line thickness control bomb and bomb control wire insulation decorative plate is mounted on the wall. (5) Paste one board: Apply adhesive mortar board back plate area ≥40% back area, painted a good adhesive mortar board should immediately flat stick to the primary wall, and slide into place on the wall, the operation should do to gently and evenly squeeze to ensure pasted to the wall of decorative plate surface flatness to meet the requirements, and at any time with a 2.0m of whole flatness correction performed by foot. About 24 hours, and other hardened mortar, playing the "ten" and "one" type anchor. (6) sealant or putty pointing pointing: when caulking caulk insulation materials first, then building weather sealant or caulking putty pointing, building weather sealant or caulking putty thinnest of not less than 3 mm thick, glue joints should hook into full, dense, continuous, uniform, no bubbles concave grooves. (7) to the protective film, clean the surface: After drying putty sealant pointing tore off the protective film on the plate surface cleaning, and to guard against scratching board. (8) Acceptance: go after the protective film, clean the surface, check the layout flat, vertical and angle Founder of yin and yang. Do not meet the requirements of the timely replacement. Xiao Bian Tips: external climate for finished boards install insulation decorative effects is very limited, you can rest assured that use.
Admin>>>
You are the 33471 visitor
Copyright © GuangDong ICP No. 10089450, Decoration Engineering Co., Ltd. Shandong takeoff All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 33471 visitor
Copyright © GuangDong ICP No. 10089450, Decoration Engineering Co., Ltd. Shandong takeoff All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility