Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13599970
| No.13599970
- Product Categories
- Friendly Links
| Information Name: | One board thin stone craft, decorative takeoff (certified), thin stone one board |
| Published: | 2015-04-07 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Construction stone walls Notes Edit this paragraph stone walls folded structure system is connected to the thin stone final pre (post) buried one piece with the main structure board processing, pre (post) the quality of embedded parts are particularly important. To ensure the quality of pre (post) buried parts, following the construction of stone walls to effectively Note: 1, pre (post) embedded parts must be determined anchor plate size, the diameter of the anchor tendons designers strictly calculated by the forces the length and thickness of the weld, where the minimum thickness of the anchor plate and the anchor bar spacing, Anchorage anchor plate edge distance, etc. but also to meet the construction requirements specification. 2, pre (post) embedded parts shall not be located in the lightweight partition. Walls embedded parts reliable connection point with the main structure of the building is mainly in the main structure of reinforced concrete (or steel) plate of columns and beams. For larger size storey floors, designer for the curtain pole to solve the problem by force, in addition to increasing the size or the use of high-strength sectional pole material, but some projects supported by the addition of a wall between the upper and lower floors beams point, this point should be supported in the reinforced soil mixed suspect (or steel) structural beam (column) can be reliable and effective. In fact one of Tai'an thin stone slab, in the "curtain norms" in has been a "light filling the wall should not be used as a support structure curtain" requirement. A stone curtain wall construction technology standard one, a construction preparation, technical preparation (1) be familiar with the review of the construction drawings 1) review the design drawings are complete, complete; 2) review of design drawings and instructions are the same in content as well as its design drawings whether the contradictions between the various components and error; 3) review of building plans, structural drawings and curtain wall design and construction drawings in geometry, coordinates, elevation, description, etc. are the same, the technical requirements are correct; 4) review of the curtain wall engineering production process and technical requirements, civil construction quality control meets the requirements of the curtain wall construction; 5) the intensity of the various components of the review walls, stiffness and stability meets the requirements; review curtain wall design of complex engineering drawings, construction difficult and technically demanding One sub-thin stone slab wholesale, clear the existing construction technology and management level of ability to meet schedule and quality requirements, the measures to be taken to ensure viable technology; 6) a clear time limit, stages of construction or delivery order and time; specifically works with the main material, the number of equipment, specifications, source and delivery dates; 7) clear the building, collaborative design, civil engineering and construction units, with the relationship; construction conditions clear construction unit can provide thin Stone one board process, takeoff decoration (certified), thin stone slab from one takeoff Decoration Engineering Co., Ltd., Shandong offer. Shandong takeoff Decoration Engineering Co., Ltd. (www.sdtfzs.com) (www.sdtfzs.com) Shandong Tai'an, granite leaders, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customers needs. In takeoff decorative leadership with the staff warmly welcome all inquiries negotiations to create a better future for takeoff decoration. |
Admin>>>
You are the 33471 visitor
Copyright © GuangDong ICP No. 10089450, Decoration Engineering Co., Ltd. Shandong takeoff All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 33471 visitor
Copyright © GuangDong ICP No. 10089450, Decoration Engineering Co., Ltd. Shandong takeoff All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

