Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13599970

- Product Categories
- Friendly Links
Information Name: | One thin stone plate processing, takeoff decoration (certified), stone one board |
Published: | 2015-04-27 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Performance: 3, waterproof design with a waterproof one board thin stone wholesale, corrosion resistance silicone sealant, waterproofing agents in the sub-lattice seam and windowsill so easy seepage parts for water treatment, limiting one stone slab moisture intrusion prices, more use of the internal cavity ventilation to prevent rain water into the stone one board, and distribute water vapor from inside outwards through the pressure discharge port to avoid condensation of moisture on the back panel, so it will not rust mechanical fastening systems, insulation can be kept dry. 4, the fire protection design energy-saving insulation decorative one is super fire board material, EPS / XPS insulation layer B2 retardant materials. Products in terms of the overall structure or from the performance, have good fire resistance. Construction period (10,000 square meters computing) 6-8 months 2 months or so reduced by 50% rating - 60% overall costs 440-800 yuan / kept for 40 yuan / 360-600 / m comes with higher grade insulation Stone preferential rate The larger 20--40% lower environmental impact of the construction site dusty, noisy construction waste and no noise reduction of 80% in case of a security risk board due to stress too much force or easily broken off. After filling the insulation is easy to form cold bridges resulting in condensation rust keel board one stone pendant wholesale system, reduce the life of condensation within the wall will make the mildew damage interior decorative effect. Once the natural life will not fall off the wall. No efflorescence, condensation, cold bridges problems. After the board listed by external shocks will not fall. With life and architecture. 90% reduction in rain or wind conditions require the construction of more than five inoperable unaffected reduced by 30% (from the environment) are not energy-saving efficiency while increasing the overall density of the building to meet the needs of 65% of energy, materials 300% m can reduce the load increased by 80% overall benefit 60-80㎏ high installation costs, maintenance costs, not energy. The use of low cost high installation cost, low maintenance cost, energy-saving effect. Low cost increase rate equal to 300% cost savings per square meters of stone surface material is calculated as 230 yuan / square meters of stone Completion Price: 627 yuan / square meters same decorative surface insulation decorative stone 460 yuan / square meters to save 1.6 million square meters of ultra-thin stone one board processing, takeoff decoration (certified), one of the board by the Shandong takeoff Stone Decoration Engineering Limited. Shandong takeoff Decoration Engineering Co., Ltd. (www.sdtfzs.com) (www.sdtfzs.com) Shandong Tai'an, granite leaders, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customers needs. In takeoff decorative leadership with the staff warmly welcome all inquiries negotiations to create a better future for takeoff decoration. |
Admin>>>
You are the 33471 visitor
Copyright © GuangDong ICP No. 10089450, Decoration Engineering Co., Ltd. Shandong takeoff All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 33471 visitor
Copyright © GuangDong ICP No. 10089450, Decoration Engineering Co., Ltd. Shandong takeoff All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility